Responsive, robust and resilient

Kotler and Caslione (2) address the problem of chaotic or turbulent environments. They suggest that organisations need to plan to be:

• responsive – the ability to react quickly to change

• robust – the ability to withstand stresses and to cope well with change without losing functionality

• resilient – the ability to rebound to a position of success.

Consider human resources management when there is a severe and unexpected turndown in business. HR management would need to be:

• responsive – it might be necessary to block all hiring, to ban overtime, to freeze pay and to make redundancies

• robust – care is needed when choosing who should go so as not to jeopardise functionality; care is also needed to preserve motivation and to try to keep good staff

• resilient – instead of redundancies, it might be better to ask employees to move to shorter working weeks so that valuable talent is not lost for ever. Then, when the economy recovers, the company is ready to bounce back immediately without a delay for recruitment.

Practical approaches

Flexibility

Responsiveness, robustness and resilience are really an expansion of the concept of flexibility. It is essential to try to build flexibility into any strategic plan – even in relatively stable conditions. One of the standard criticisms of the rational planning approach is that it lacks or inhibits flexibility (though that is more a criticism of how the plan is used rather than a criticism of planning itself). Examples of building in flexibility include:

• leaving headroom in any financing plan. For example, arranging lines of credit

• having break-clauses or extension options in lease agreements

• building in the ability to upgrade or extend operations

• use of currency options

• buying from a range of suppliers. For example, some companies that relied on just-in-time inventory had problems after the Japanese earthquake because their supplies were quickly exhausted. Now manufacturers try to build flexibility into their supply chains

• stand-by and disaster recovery plans for IT systems

• a mix of permanent and sub-contracting staff

• pilot operations to gain experience in new ventures. If successful the operations can be extended and can make use of experience gained

• joint ventures to spread risk and finance, and to make use of a wide range of expertise.

我要纠错】 责任编辑:蓝色天空

免费试听

  • Jessie《FR 财务报告》

    Jessie主讲:《FR 财务报告》免费听

  • 张宏远《MA 管理会计》

    张宏远主讲:《MA 管理会计》免费听

  • 何 文《SBL 战略商业领袖》

    何 文主讲:《SBL 战略商业领袖》免费听

限时免费资料

  • 近10年A考汇总

    历年样卷

  • 最新官方考试大纲

    考试大纲

  • 各科目专业词汇表

    词汇表

  • ACCA考试报考指南

    报考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串讲直播

    思维导图

回到顶部
折叠
网站地图

Copyright © 2000 - www.chinaacc.com All Rights Reserved. 北京正保会计科技有限公司 版权所有

京B2-20200959 京ICP备20012371号-7 出版物经营许可证 京公网安备 11010802044457号