24周年

财税实务 高薪就业 学历教育
APP下载
APP下载新用户扫码下载
立享专属优惠

安卓版本:8.7.50 苹果版本:8.7.50

开发者:北京正保会计科技有限公司

应用涉及权限:查看权限>

APP隐私政策:查看政策>

HD版本上线:点击下载>

ACCA考试08年6月P1试题答案(4)

来源: 正保会计网校论坛 编辑: 2010/08/11 10:25:40 字体:

  (d)Chairman’s statement at AGM

  Thank you for coming to the annual general meeting of Rowlands & Mendeleev. I would like to make a statement in response to the concerns that a number of our investors have made in respect to our appointment as the principal contractor for the prestigious and internationally important Giant Dam Project. We are very pleased and honoured to have won the contract but as several have observed,this does leave us in a position of having a number of issues and risks to manage.

  As a project with obvious environmental implications,the board and I wish to reassure investors that we are aware of these implications and have taken them into account in our overall assessment of risks associated with the project.

  (i) A definition of ‘sustainable development’

  One investor asked if we could explain the sustainability issues and I begin with addressing that issue. According to the well-established Brundtland definition,sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs.

  This definition has implications for energy,land use,natural resources and waste emissions. In a sustainable development,all of these should be consumed or produced at the same rate they can be renewed or absorbed so as to prevent leaving future generations with an unwanted legacy of today’s economic activity. We believe that our involvement in the Giant Dam Project has implications for environmental sustainability and it is to these matters that I now turn.

  Tutorial note: other relevant definitions of sustainability will be equally acceptable.

  (ii) Environmental and sustainability implications of the Giant Dam Project

  In our preparation for the bid to act as principal contractor for the Giant Dam Project,we established that there were two prominent negative implications of the project but these are,in our view,more than offset by two major environmental positives.

  The environmental arguments against the Giant Dam Project both concern the flooding of the valley behind the dam. Regrettably, it seems that there will be some loss of important habitats. This,in turn,may mean the removal of balanced environmental conditions for certain animal and plant species. In addition,the flooding of the valley will result in the loss of productive farmland. This will mean reduced capacity for the host country to grow food and thus support citizens such as the members of First Nation. From our point of view,as the board of R&M,however,we would remind shareholders and other observers that the decisions involving the size and positioning of the Giant Dam were taken by the client,the government. It is R&M’s job,having won the contract as principal contractor,to now carry out the plans,regardless of our own views.

  Happily,however,there are two very powerful environmental arguments in favour of the Giant Dam Project. It will create a large source of clean energy for economic development that will be sustainable,as it will create no carbon emissions nor will it consume any non-renewable resources as it does so (compared to,for example,fossil fuels)。

  At a time when people are becoming very concerned about greenhouse gases produced from conventional power generation,the Giant Dam Project will contribute to the East Asian country‘s internationally agreed carbon reduction targets. This,in turn,will contribute to the reduction of greenhouse gases in the environment.

  It is clear that the construction of the Giant Dam Project is an environmental conundrum with strong arguments on both sides. The deciding factor may be the opinion that we each have of the desirability of economic growth in the East Asian country (which the energy from the dam is intended to support).It seems that Stop-the-dam values the preservation of the original environment more than the economic growth that the energy from the dam would support. The client does not agree with this assessment and we are happy to be involved with a project that will create such a useful source of renewable and non-polluting energy.

[上一页]                  [下一页

我要纠错】 责任编辑:肖肖

免费试听

  • Jessie《FR 财务报告》

    Jessie主讲:《FR 财务报告》免费听

  • 张宏远《MA 管理会计》

    张宏远主讲:《MA 管理会计》免费听

  • 何 文《SBL 战略商业领袖》

    何 文主讲:《SBL 战略商业领袖》免费听

限时免费资料

  • 近10年A考汇总

    历年样卷

  • 最新官方考试大纲

    考试大纲

  • 各科目专业词汇表

    词汇表

  • ACCA考试报考指南

    报考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串讲直播

    思维导图

回到顶部
折叠
网站地图

Copyright © 2000 - www.chinaacc.com All Rights Reserved. 北京正保会计科技有限公司 版权所有

京B2-20200959 京ICP备20012371号-7 出版物经营许可证 京公网安备 11010802044457号